Inspection and treatment of plastic crusher

2021-09-07

1. The connecting parts of the motor, reducer, hydraulic coupling, head and tail must be complete, intact and fastened. There should be no oil leakage or oil leakage in the shaft joints of the reducer and hydraulic unit, and the oil quantity should be appropriate.

2. The signal must be sensitive and reliable, and it is not allowed to turn on without a signal. The spray sprinkler must be in good condition.

3. The power cables and operating wires must be hung neatly and free from squeezing;

4. The coal, gangue, debris, motor and reducer coal dust near the nose must be cleaned up;

5. The overlap between the head of the scraping conveyor and the tail of the transfer machine should be appropriate;

6. The scraper chain plate must be moderately tight, and the scraper and screws must be fully tightened;

7. The traveling trolley of the transfer machine must be stable and reliable;

8. When the reprinter is turned on under the partial condition of the bridge body, there should be no abnormal noise in the operation of the various parts, and the scraper, chain, and connecting ring should be free from twisting, twisting, or bending;

9. The roadway support at the plastic crusher and crusher must be intact and firm.

10. The safety protection net and protection device of the crusher must be guaranteed to be safe and reliable without deformation and failure;

11. The roadway support at the transfer machine and plastic crusher must be intact and firm.